Integrated House BOQ — No Double Counting

Combine a room schedule with one structural quantity schedule. Choose exactly one source for wall and slab quantities. All rates are entered by you.

Preliminary budget takeoff only. Shared room walls are not automatically deduplicated; use measured unique wall runs for accuracy. Structural measurements and steel quantities must be engineer-approved.

Room-by-room quantities

Roomm² floorm² walls

Unique structural schedule

Room wall method double-counts shared boundaries; select unique wall runs for reliable masonry quantities. Room slabs and building slabs are mutually exclusive.

Local rates and project costs

Rates are manual. Changing currency clears all rates; currency exchange is NOT automatic.

Project BOQ

Overlapping slab/beam/column concrete at intersections is not geometrically deducted. Engineer review required before ordering materials. Room schedule assumes rectangular rooms. Rates of zero mean omitted cost, not free material.

कैसे इस्तेमाल करें

देश, मुद्रा और माप की इकाई चुनें। स्थानीय सप्लायर की दर भरें; मुद्रा चुनने से कीमतें अपने आप नहीं बदलतीं।

स्थान के अनुसार दरें और अनुमान बदलते हैं। सामग्री खरीदने से पहले मात्रा तथा वेस्टेज जाँचें।

ये केवल प्रारंभिक अनुमान हैं, प्रमाणित संरचनात्मक डिज़ाइन या अंतिम लागत नहीं।