Integrated House BOQ — No Double Counting
Combine a room schedule with one structural quantity schedule. Choose exactly one source for wall and slab quantities. All rates are entered by you.
Preliminary budget takeoff only. Shared room walls are not automatically deduplicated; use measured unique wall runs for accuracy. Structural measurements and steel quantities must be engineer-approved.
Room-by-room quantities
| Room | m² floor | m² walls |
|---|
Unique structural schedule
Room wall method double-counts shared boundaries; select unique wall runs for reliable masonry quantities. Room slabs and building slabs are mutually exclusive.
Local rates and project costs
Rates are manual. Changing currency clears all rates; currency exchange is NOT automatic.
Project BOQ
Overlapping slab/beam/column concrete at intersections is not geometrically deducted. Engineer review required before ordering materials. Room schedule assumes rectangular rooms. Rates of zero mean omitted cost, not free material.
طريقة الاستخدام
اختر البلد والعملة، ثم أدخل الأبعاد بالسنتيمتر أو المتر أو القدم أو البوصة حسب الخيارات المتاحة. أدخل أسعار المواد المحلية ولا تفترض تحويل الأسعار تلقائياً.
الأسعار والافتراضات تختلف حسب الموقع. تحقق من الكميات والهدر ومواصفات المواد قبل الشراء.
النتائج تقريبية لأغراض التخطيط فقط. لا تحل محل التصميم الهندسي أو الأسعار المعتمدة.